FY 23 APPROVED CAPITAL BUDGET
Meadowvale Elementary School
BOARD OF EDUCATION Project Number:
Operating Budget Impact
B234123
Council District:
F
Revenues:
Location:
Havre de Grace
Expenditures: Cost Savings: None:
Est. Debt Service:
$10,750 (annual)
X
Expended/Encumbered as of 2/9/22: $0
Project Schedule/Status: Summer 2022: Design Fall 2022: Bid Winter 2022 - Spring 2023: Construction
PROJECT DESCRIPTION: The funds will be used to replace the 21 year old failing air-cooled rotary screw chiller with a new energy efficient air-cooled chiller. The current chiller has been previously identified as requiring replacement. Recently, it has experienced increased failures that caused the school to be without cooling for a short period. Future problems could lead to additional damage done to the internal components of the chiller. There is a risk of possible permanent damage and loss of cooling for an extended period of time.
EXPENDITURE SCHEDULE
Approp Total
Cost Element
Prior
FY 2023
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028
TOTAL
Engineering/Design Land Acquisition
100,000
100,000
100,000
0
0
Construction
770,000
770,000
770,000
Inspection Fees
0 0
0 0
Equipment/Furnishing
Total Cost:
0 870,000
870,000
0
0
0
0
0
870,000
FUNDING SCHEDULE
R7920 State Bonds R7000 Future Bonds
440,000 430,000
440,000 430,000
440,000 430,000
0 0 0
0 0 0
Total Cost:
0 870,000
870,000
0
0
0
0
0
870,000
170