FY 23 APPROVED CAPITAL BUDGET
Abingdon Road Bridge #169 over CSX
HIGHWAYS - BRIDGES Project Number:
Operating Budget Impact
H104501
Council District:
F
Revenues:
Location:
Abingdon
Expenditures: Cost Savings: None:
Est. Debt Service:
$23,250 (annual)
X
Expended/Encumbered as of 2/9/22: $894,620
Project Schedule/Status: Design is approximately 40% complete; FY 22-24 construction.
PROJECT DESCRIPTION: This project is to replace existing bridge over CSX. This project is eligible for Federal Funds. The bridge's deck is in poor condition and the beams are deteriorating and need to be replaced. The project will be innovative in that ABC/PBES (Accelerated Bridge Construction/Pre-Fabricated Bridge Element Systems) will be utilized. This project is eligible for Federal funding. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.
EXPENDITURE SCHEDULE
Approp Total
Cost Element
Prior
FY 2023
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028
TOTAL
Engineering/Design Land Acquisition
820,000 360,000
820,000 360,000
820,000 360,000
Construction
3,950,000 2,400,000 6,350,000 2,400,000
8,750,000
Inspection Fees
100,000 100,000
200,000 100,000
300,000
Equipment/Furnishing
0
0
Total Cost:
5,230,000 2,500,000 7,730,000 2,500,000
0
0
0
0 10,230,000
FUNDING SCHEDULE R8750 Paygo R3140 Federal TAP R7100 Prior Bonds R8770 Reappropriated R7000 Future Bonds
240,762
240,762
240,762
3,990,000 2,000,000 5,990,000 2,000,000
7,990,000 1,430,000
930,000 69,238
930,000 500,000
69,238 500,000
69,238 500,000
500,000
Total Cost:
5,230,000 2,500,000 7,730,000 2,500,000
0
0
0
0 10,230,000
277