FY 23 APPROVED CAPITAL BUDGET
Fawn Grove Road Bridge #132
HIGHWAYS - BRIDGES Project Number:
Operating Budget Impact
H144502
Council District:
D
Revenues:
Location:
Pylesville
Expenditures: Cost Savings: None:
Est. Debt Service:
$0
(annual)
X
Expended/Encumbered as of 2/9/22: $5,467
Project Schedule/Status: FY 24: Design FY 25: Right of way and permits FY 27: Construction
PROJECT DESCRIPTION: The purpose of this project is to replace the bridge that carries Fawn Grove Road over a tributary of Deer Creek. The existing bridge is a single lane bridge on a rural collector roadway. It is narrow and very poorly aligned with the road, with a severe horizontal curve on the north side of the bridge. The bridge is also poorly aligned with the stream, requiring prior scour repairs to keep the bridge in service. The proposed bridge will widen the existing bridge and better align it with the approach of roadways and streams. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.
EXPENDITURE SCHEDULE
Approp Total
Cost Element
Prior
FY 2023
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028
TOTAL
Engineering/Design Land Acquisition
10,000
10,000 400,000
410,000 50,000
0 0 0 0
50,000
Construction
1,250,000
1,250,000
Inspection Fees
75,000
75,000
Equipment/Furnishing
0
Total Cost:
10,000
0
10,000 400,000
50,000
0 1,325,000
0
1,785,000
FUNDING SCHEDULE
R8750 Paygo R7000 Future Bonds
10,000
10,000
10,000
0 400,000
50,000
1,325,000
1,775,000
0 0 0
0 0 0
Total Cost:
10,000
0
10,000 400,000
50,000
0 1,325,000
0
1,785,000
299