FY 23 APPROVED CAPITAL BUDGET
Stormdrain Rehabilitation
HIGHWAYS - ROADS Project Number:
Operating Budget Impact
H064513 Multiple Various
Council District:
Revenues:
Location:
Expenditures: Cost Savings: None:
Est. Debt Service:
$0
(annual)
X
Expended/Encumbered as of 2/9/22: $1,854,722
Project Schedule/Status: Various projects are continuously being designed and constructed under this account.
PROJECT DESCRIPTION: Funds are to be used for replacement/rehabilitation/repair of existing stormdrain systems throughout the County. Additional funds are to be used for an inspection of the stormdrains. Due to the cost associated with inspecting all of the stormdrains in the County, the stormdrains most susceptible to deterioration will be inspected in the first phase of this analysis (i.e. corrugated metal pipes, greater than 48" in diameter and with a continuous base flow of water).
EXPENDITURE SCHEDULE
Approp Total
Cost Element
Prior
FY 2023
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028
TOTAL
Engineering/Design Land Acquisition
310,000
10,000
320,000
10,000
10,000
10,000
10,000
10,000
370,000
0
0
Construction
1,571,231 175,000 1,746,231 175,000 175,000 175,000 175,000 175,000
2,621,231
Inspection Fees
160,000
15,000
175,000
15,000
15,000
15,000
15,000
15,000
250,000
Equipment/Furnishing
0
0
Total Cost:
2,041,231 200,000 2,241,231 200,000 200,000 200,000 200,000 200,000
3,241,231
FUNDING SCHEDULE
R8750 Paygo R7000 Future Bonds
2,041,231
2,041,231
2,041,231 1,200,000
200,000
200,000 200,000 200,000 200,000 200,000 200,000
0 0 0
0 0 0
Total Cost:
2,041,231 200,000 2,241,231 200,000 200,000 200,000 200,000 200,000
3,241,231
320