Water Zone Improvements
WATER Project Number: Council District:
Operating Budget Impact
W146660 Multiple
Revenues:
Location:
Various
Expenditures: Cost Savings: None:
Est. Debt Service:
$0
(annual)
X
Expended/Encumbered as of 2/9/22: $334,502
Project Schedule/Status: This is an ongoing project to maintain the condition of critical water infrastructure. 2021-2022: Design Conowingo Road loop replace; design Briar Hill water main improve; update modeling systemwide. 2025: Omar Village loop design
PROJECT DESCRIPTION: This project allows for the evaluation, modeling, design, construction, and/or installation of water mains, controls, safety improvements, backflow preventers, meter, and equipment as needed within the four separate zones of Harford County's water service area. This project allows for water piping loops and/or upsizing of pipes within the system, and improvements to the water booster stations that benefit an individual zone or entire service area.
EXPENDITURE SCHEDULE
Approp Total
Cost Element
Prior
FY 2023
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028
TOTAL
Engineering/Design Land Acquisition
100,000
100,000
100,000
0
0
Construction
930,000
930,000 200,000 100,000 200,000
1,430,000
Inspection Fees
0 0
0 0
Equipment/Furnishing
Total Cost:
1,030,000
0 1,030,000 200,000 100,000 200,000
0
0
1,530,000
FUNDING SCHEDULE
R8750 Paygo
1,030,000
1,030,000 200,000 100,000 200,000
1,530,000
0 0 0 0
0 0 0 0
Total Cost:
1,030,000
0 1,030,000 200,000 100,000 200,000
0
0
1,530,000