FY 23 APPROVED CAPITAL BUDGET

Bio Solids Facilities Enhancements

SEWER Project Number: Council District:

Operating Budget Impact

S176019 Multiple Various

Revenues:

Location:

Expenditures: Cost Savings: None:

Est. Debt Service:

$482,500 (annual)

X

Expended/Encumbered as of 2/9/22: $5,486,177

Project Schedule/Status: Design scope for drying 2022; design of biogas optimization is underway. Dewatering building construction complete; digester upgrades at at 50% design.

PROJECT DESCRIPTION: This project is to fund the enhancements to our bio solids treatment facilities and bio solids recycling/disposable program. Bio solids (processed residuals from the treatment of domestic wastewater) contain nutrients and other qualities that improve soils and make them highly desirable to many area farmers within Harford County and elsewhere in Maryland. However, nutrient controls being imposed by the State Department of Agriculture and MDE to help protect the Chesapeake Bay are dramatically affecting the ability to recycle these materials. Reduced application rates and time of year restrictions have created a significant impact to our program. The study recommended advances to our solids treatment train, enhanced drying, dewatering, storage, beneficial utilization and optimization of biogas, and beneficial reuse of the dried bio solids. Optimization of the bio solids entails improvements to the digester system and is part of the digester upgrade.

EXPENDITURE SCHEDULE

Approp Total

Cost Element

Prior

FY 2023

FY 2024 FY 2025 FY 2026 FY 2027 FY 2028

TOTAL

Engineering/Design Land Acquisition

1,350,000

1,350,000

1,350,000

0

0

Construction

17,600,000

17,600,000 7,000,000 7,000,000

350,000 3,500,000 35,450,000

Inspection Fees

550,000

550,000

550,000

Equipment/Furnishing

0

0

Total Cost:

19,500,000

0 19,500,000 7,000,000 7,000,000

0 350,000 3,500,000 37,350,000

FUNDING SCHEDULE

R8750 Paygo R7100 Prior Bonds R7000 Future Bonds

200,000

200,000

200,000

19,300,000

19,300,000

19,300,000

0 7,000,000 7,000,000

350,000 3,500,000 17,850,000

0 0

0 0

Total Cost:

19,500,000

0 19,500,000 7,000,000 7,000,000

0 350,000 3,500,000 37,350,000

403

Made with FlippingBook Online newsletter creator