FY 23 APPROVED CAPITAL BUDGET
Bio Solids Facilities Enhancements
SEWER Project Number: Council District:
Operating Budget Impact
S176019 Multiple Various
Revenues:
Location:
Expenditures: Cost Savings: None:
Est. Debt Service:
$482,500 (annual)
X
Expended/Encumbered as of 2/9/22: $5,486,177
Project Schedule/Status: Design scope for drying 2022; design of biogas optimization is underway. Dewatering building construction complete; digester upgrades at at 50% design.
PROJECT DESCRIPTION: This project is to fund the enhancements to our bio solids treatment facilities and bio solids recycling/disposable program. Bio solids (processed residuals from the treatment of domestic wastewater) contain nutrients and other qualities that improve soils and make them highly desirable to many area farmers within Harford County and elsewhere in Maryland. However, nutrient controls being imposed by the State Department of Agriculture and MDE to help protect the Chesapeake Bay are dramatically affecting the ability to recycle these materials. Reduced application rates and time of year restrictions have created a significant impact to our program. The study recommended advances to our solids treatment train, enhanced drying, dewatering, storage, beneficial utilization and optimization of biogas, and beneficial reuse of the dried bio solids. Optimization of the bio solids entails improvements to the digester system and is part of the digester upgrade.
EXPENDITURE SCHEDULE
Approp Total
Cost Element
Prior
FY 2023
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028
TOTAL
Engineering/Design Land Acquisition
1,350,000
1,350,000
1,350,000
0
0
Construction
17,600,000
17,600,000 7,000,000 7,000,000
350,000 3,500,000 35,450,000
Inspection Fees
550,000
550,000
550,000
Equipment/Furnishing
0
0
Total Cost:
19,500,000
0 19,500,000 7,000,000 7,000,000
0 350,000 3,500,000 37,350,000
FUNDING SCHEDULE
R8750 Paygo R7100 Prior Bonds R7000 Future Bonds
200,000
200,000
200,000
19,300,000
19,300,000
19,300,000
0 7,000,000 7,000,000
350,000 3,500,000 17,850,000
0 0
0 0
Total Cost:
19,500,000
0 19,500,000 7,000,000 7,000,000
0 350,000 3,500,000 37,350,000
403