FY 24 APPROVED CAPITAL BUDGET BOOK
Schucks Road Improvements
HIGHWAYS - ROADS Project Number:
Operating Budget Impact
H064503
Council District:
E
Revenues:
Location:
Bel Air
Expenditures: Cost Savings: None:
Est. Debt Service:
$21,911 (annual)
X
Expended/Encumbered as of 1/9/23: $737,697
Project Schedule/Status:
PROJECT DESCRIPTION: This project consisted of improving Moores Mill Road between MD 924 and Southampton Middle School to address the safety and traffic volume increases due to the continuous development in and around the Bel Air area. Approximately 10,000 linear feet of closed section road is proposed to be built. Moores Mill Road functions as a collector road between two State roads. Phase 1 is from US 1 (Business) east to Southampton Road. Phase 2 is from US 1 (Business) west to MD 924 and needs to start construction prior to January 2017 or the project will need to be completely redesigned to meet the new SWM regulations (currently grandfathered). This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.
EXPENDITURE SCHEDULE
Cost Element
Prior
FY 2024 Approp Total
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
TOTAL
Engineering/Design Land Acquisition
22,630
22,630
22,630
0
0
Construction
1,020,738
1,020,738
1,020,738
Inspection Fees
0 0
0 0
Equipment/Furnishing
Total Cost:
1,043,368
0 1,043,368
0
0
0
0
0
1,043,368
FUNDING SCHEDULE
R7100 Prior Bonds
1,043,368
1,043,368
1,043,368
0 0 0 0
0 0 0 0
Total Cost:
1,043,368
0 1,043,368
0
0
0
0
0
1,043,368