FY 25 Harford County Approved Capital Budget
Joppa Farm Road
HIGHWAYS - ROADS Project Number:
Operating Budget Impact
H254505
Council District:
A
Revenues:
Location:
Joppatowne
Expenditures: Cost Savings: None:
Est. Debt Service:
$12,000 (annual)
X
Expended/Encumbered as of 2/22/24: $0
Project Schedule/Status:
PROJECT DESCRIPTION: A preliminary engineering study is to be performed on Joppa Farm Road between US 40 and Barksdale Road to determine possible improvements to improve road safety, reduce future road maintenance and improve walking and cycling options. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation to serve existing and future populations.
EXPENDITURE SCHEDULE
Cost Element
Prior
FY 2025 Approp Total
FY 2026 FY 2027 FY 2028 FY 2029 FY 2030
TOTAL
Engineering/Design Land Acquisition
500,000
500,000
500,000
0 0 0 0
0 0 0 0
Construction
Inspection Fees
Equipment/Furnishing
Total Cost:
0 500,000
500,000
0
0
0
0
0
500,000
FUNDING SCHEDULE
R7920 State Bonds R7000 Future Bonds
0
0
500,000
500,000
500,000
0 0 0
0 0 0
Total Cost:
0 500,000
500,000
0
0
0
0
0
500,000