Laurel Bush Road Culvert

HIGHWAYS - BRIDGES Project Number:

Expended/Encumbered $0

H264502

Council District:

F

Location:

Abingdon

Project Schedule/Status: FY 26: Design FY 28: Right of Way FY 29: Construction

Expended/Enc.

Budget

PROJECT DESCRIPTION: Located between Burgh Westra Way and Snapdragon Ct.

This 54" culvert carries Laurel Bush Road over a Tributary to Bynum Run. This project is to replace/supplement the existing culvert to address occasional flooding of the stream channel and roadway during large storm events. A new structure would consist of a larger opening to pass larger design storms. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.

EXPENDITURE SCHEDULE

Cost Element

Prior

FY 2026 Approp Total

FY 2027 FY 2028 FY 2029 FY 2030 FY 2031

TOTAL

Engineering/Design Land Acquisition

600,000

600,000

600,000

0 0 0 0

0 0 0 0

Construction

Inspection Fees

Equipment/Furnishing

Total Cost:

0 600,000

600,000

0

0

0

0

0

600,000

FUNDING SCHEDULE

0

0

R3140 Federal TAP R7000 Future Bonds

600,000

600,000

600,000

0 0 0

0 0 0

Total Cost:

0 600,000

600,000

0

0

0

0

0

600,000

ESTIMATED OPERATING BUDGET IMPACT:

FY 2026 17,220

FY 2027 FY 2028 FY 2029 FY 2030 FY 2031

TOTAL 90,405

16,359

15,498

14,637

13,776

12,915

286