FY 26 Harford County Proposed Capital Budget Book

Abingdon Road Bridge #169 over CSX

HIGHWAYS - BRIDGES Project Number:

Expended/Encumbered as of 2/4/25: $1,924,084

H104501

Council District:

F

Location:

Abingdon

Project Schedule/Status: FY 26 Construction

Expended/Enc.

Budget

PROJECT DESCRIPTION: This project is to replace existing bridge over CSX. This project is eligible for Federal Funds. The bridge's deck is in poor condition and the beams are deteriorating and need to be replaced. The project will be innovative in that ABC (Accelerated Bridge Construction) will be utilized. This project is eligible for Federal funding. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.

EXPENDITURE SCHEDULE

Cost Element

Prior

FY 2026 Approp Total

FY 2027 FY 2028 FY 2029 FY 2030 FY 2031

TOTAL

Engineering/Design Land Acquisition

820,000 360,000

820,000 360,000

820,000 360,000

Construction

17,650,000 1,250,000 18,900,000

18,900,000

Inspection Fees

200,000 250,000

450,000

450,000

Equipment/Furnishing

0

0

Total Cost:

19,030,000 1,500,000 20,530,000

0

0

0

0

0 20,530,000

FUNDING SCHEDULE R8750 Paygo R3140 Federal TAP R7100 Prior Bonds R8770 Reappropriated

240,762

240,762

240,762

14,990,000 1,500,000 16,490,000

16,490,000 3,730,000

3,730,000

3,730,000

69,238

69,238

69,238

0

0

Total Cost:

19,030,000 1,500,000 20,530,000

0

0

0

0

0 20,530,000

Estimated Debt Service ESTIMATED OPERATING BUDGET IMPACT:

FY 2026 107,051

FY 2027 FY 2028 FY 2029 FY 2030 FY 2031

TOTAL

562,018

101,698

96,346

90,993

85,641

80,288

272