FY 26 Harford County Proposed Capital Budget Book

Edwards Lane Culvert

HIGHWAYS - BRIDGES Project Number:

Expended/Encumbered $0

New

Council District:

E

Location:

Churchville

Project Schedule/Status: FY 28: Update design and permitting, utility relocation and construction

Expended/Enc.

Budget

PROJECT DESCRIPTION: This project is to replace the existing culvert on Edwards Lane approximately 1/4 mile east of Schucks Road. The existing culvert is deteriorating and undersized. The road in the immediate vicinity of the culvert is poorly aligned with inadequate drainage. This segment of road occasionally floods causing a hazard to motorists and potential damage to the roadway itself. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.

EXPENDITURE SCHEDULE

Cost Element

Prior

FY 2026 Approp Total

FY 2027 FY 2028 FY 2029 FY 2030 FY 2031

TOTAL

Engineering/Design Land Acquisition

0 0 0 0 0 0

50,000

50,000

0

Construction

900,000 100,000

900,000 100,000

Inspection Fees

Equipment/Furnishing

0

Total Cost:

0

0

0 1,050,000

0

0

0 1,050,000

FUNDING SCHEDULE

R7000 Future Bonds

0 0 0 0

1,050,000

1,050,000

0 0 0 0

Total Cost:

0

0

0

0 1,050,000

0

0

0 1,050,000

ESTIMATED OPERATING BUDGET IMPACT:

FY 2026

FY 2027 FY 2028 FY 2029 FY 2030 FY 2031

TOTAL