FY 26 Harford County Proposed Capital Budget Book
Glenville Road Bridge #30
HIGHWAYS - BRIDGES Project Number:
Expended/Encumbered as of 2/4/25: $415,681
H164501 Multiple
Council District:
Location:
Churchville
Project Schedule/Status: FY 22-27: Design FY 27: Right of way and Utility Relocation FY 29: Construction
Expended/Enc.
Budget
PROJECT DESCRIPTION: This project is to replace the bridge that carries Glenville Road over Mill Brook. The existing bridge is a single lane, steel beam, concrete deck structure. The existing concrete deck, exterior beams, and wingwalls are severely deteriorated and there is evidence of scour under the western abutment. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.
EXPENDITURE SCHEDULE
Cost Element
Prior
FY 2026 Approp Total
FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
TOTAL
Engineering/Design Land Acquisition
1,210,000
1,210,000
1,210,000
50,000
50,000
50,000
Construction
0 0 0
925,000 925,000
1,850,000
Inspection Fees
75,000
75,000
150,000
Equipment/Furnishing
0
Total Cost:
1,260,000
0 1,260,000
0 1,000,000 1,000,000
0
0 3,260,000
FUNDING SCHEDULE R8750 Paygo R3140 Federal TAP R7100 Prior Bonds R8770 Reappropriated R7000 Future Bonds
150,000 900,000 210,000
150,000 900,000 210,000
150,000
800,000 800,000
2,500,000
210,000
0 0
0
200,000 200,000
400,000
Total Cost:
1,260,000
0 1,260,000
0 1,000,000 1,000,000
0
0 3,260,000
Estimated Debt Service ESTIMATED OPERATING BUDGET IMPACT:
FY 2026
FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
TOTAL 31,642
6,027
5,726
5,424
5,123
4,822
4,520
295
Made with FlippingBook Ebook Creator