FY 26 Harford County Proposed Capital Budget Book
Resurfacing Roadways
HIGHWAYS - RESURFACING Project Number: H184503 Council District: Multiple Location: Various Project Schedule/Status: Various projects are continuously being designed and constructed under this account.
Expended/Encumbered as of 2/4/25: $47,075,269
Expended/Enc.
Budget
PROJECT DESCRIPTION: This is an ongoing project activity to resurface the County's 695+ miles of asphalt pavement. This is a critical maintenance program for the upkeep of the County's pavement system. Not only does this work provide smoother and safer roadways, but it seals out water from the sub base, thereby drastically improving the life cycle of the pavement. Included in the cost is an item to upgrade/replace handicapped ramps per Federal ADA guidelines.
This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.
EXPENDITURE SCHEDULE
Cost Element
Prior
FY 2026 Approp Total
FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
TOTAL
Engineering/Design Land Acquisition
600,000
75,000
675,000
75,000
75,000
75,000
75,000
75,000
1,050,000
0
0
Construction
61,247,870 4,681,805 65,929,675 5,675,000 6,675,000 7,675,000 8,675,000 9,675,000 104,304,675 1,700,000 250,000 1,950,000 250,000 250,000 250,000 250,000 250,000 3,200,000 0 63,547,870 5,006,805 68,554,675 6,000,000 7,000,000 8,000,000 9,000,000 10,000,000 108,554,675 0
Inspection Fees
Equipment/Furnishing
Total Cost:
FUNDING SCHEDULE R8750 Paygo R8770 Reappropriated R6130 Invest. Income
60,947,870 5,006,805 65,954,675 6,000,000 7,000,000 8,000,000 9,000,000 10,000,000 105,954,675 873,825 873,825 873,825 1,726,175 1,726,175 1,726,175 0 0 0 0 63,547,870 5,006,805 68,554,675 6,000,000 7,000,000 8,000,000 9,000,000 10,000,000 108,554,675
Total Cost:
ESTIMATED OPERATING BUDGET IMPACT:
FY 2026
FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
TOTAL
330