FY 26 Harford County Proposed Capital Budget Book
Facility Condition Assessments
GENERAL Project Number: Council District:
Expended/Encumbered as of 2/4/25: $0
A254103 Multiple Various
Location:
Project Schedule/Status:
Expended/Enc.
Budget
PROJECT DESCRIPTION:
Facility Condition Assessments (FCA) measure the condition and functionality of a building and its infrastructure as suitable and appropriate for intended functions. Specific objectives of the comprehensive assessment methodology include determining needs for renewal or replacement of building and infrastructure systems (e.g., heating/cooling, electrical, exterior envelope, etc.) and system components (e.g., cooling tower, heat exchanger, chiller, pumps, etc.), and guiding the analysis of good decision capital project options, including renovation or modernization.
FCAs may include preliminary engineering, design, and cost estimation of specific projects to bring buildings up to standard.
EXPENDITURE SCHEDULE
FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
TOTAL
Cost Element
Prior
FY 2026 Approp Total
Engineering/Design Land Acquisition
1,000,000
1,000,000 500,000 500,000
2,000,000
0 0 0 0
0 0 0 0
Construction
Inspection Fees
Equipment/Furnishing
Total Cost:
1,000,000
0 1,000,000 500,000 500,000
0
0
0
2,000,000
FUNDING SCHEDULE R8750 Paygo R6130 Invest. Income
0 500,000 500,000
1,000,000 1,000,000
1,000,000
1,000,000
0 0 0
0 0 0
Total Cost:
1,000,000
0 1,000,000 500,000 500,000
0
0
0
2,000,000
ESTIMATED OPERATING BUDGET IMPACT:
FY 2026
FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
TOTAL