FY 26 Proposed Capital Budget Book
Rush Road Bridge #97
HIGHWAYS - BRIDGES Project Number:
Expended/Encumbered as of 2/4/25: $365,722
H244502
Council District:
D
Location:
Jarrettsville
Project Schedule/Status: FY 25/26: Design FY 26: Right of way/ Utility/ Permits FY 28: Construction
Expended/Enc.
Budget
PROJECT DESCRIPTION: This project will replace the existing bridge on Rush Road over Kellogg Branch. The current structure is a single lane bridge and is posted at 24,000 lbs for single unit vehicles and 43,000 lbs for combination vehicles. The new bridge would eliminate posting and provide a two lane bridge. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.
EXPENDITURE SCHEDULE
Cost Element
Prior
FY 2026 Approp Total
FY 2027 FY 2028 FY 2029 FY 2030
FY 2031
TOTAL
Engineering/Design Land Acquisition
400,000
400,000 25,000 75,000
400,000 25,000
25,000 75,000
Construction
1,000,000
1,075,000
Inspection Fees
0 0
100,000
100,000
Equipment/Furnishing
0
Total Cost:
400,000 100,000
500,000
0 1,100,000
0
0
0 1,600,000
FUNDING SCHEDULE
R7100 Prior Bonds R7000 Future Bonds
400,000
400,000 100,000
400,000
100,000
0 1,100,000
0
0
0 1,200,000
Total Cost:
400,000 100,000
500,000
0 1,100,000
0
0
0 1,600,000
Estimated Debt Service ESTIMATED OPERATING BUDGET IMPACT:
FY 2026 14,350
FY 2027 FY 2028 FY 2029 FY 2030
FY 2031 10,763
TOTAL 64,360
13,633
12,915
1,220
11,480
283