FY 26 Proposed Capital Budget Book

Structural Evaluation

HIGHWAYS - BRIDGES Project Number:

Expended/Encumbered as of 2/4/25: $482,181

H974515 Multiple Various

Council District:

Location:

Project Schedule/Status: This is an ongoing program.

Expended/Enc.

Budget

PROJECT DESCRIPTION: This project provides readily available consultant services to design repairs for bridges and miscellaneous structures. The consultant will prepare plans for construction by contractors or in-house forces. The cost of individual projects will be negotiated based on set contract costs and personnel. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.

EXPENDITURE SCHEDULE

Cost Element

Prior

FY 2026 Approp Total

FY 2027 FY 2028 FY 2029 FY 2030

FY 2031 TOTAL

Engineering/Design Land Acquisition

670,000

50,000

720,000

50,000

50,000

50,000

50,000

50,000 970,000

0 0 0 0

0 0 0 0

Construction

Inspection Fees

Equipment/Furnishing

Total Cost:

670,000

50,000

720,000

50,000

50,000

50,000

50,000

50,000 970,000

FUNDING SCHEDULE

R8750 Paygo

670,000

50,000

720,000

50,000

50,000

50,000

50,000

50,000 970,000

0 0 0 0

0 0 0 0

Total Cost:

670,000

50,000

720,000

50,000

50,000

50,000

50,000

50,000 970,000

ESTIMATED OPERATING BUDGET IMPACT:

FY 2026

FY 2027 FY 2028 FY 2029 FY 2030

FY 2031 TOTAL