FY 26 Proposed Capital Budget Book

Grafton Shop Road at Maryland Route 23 Intersection Improvements

HIGHWAYS - ROADS Project Number:

Expended/Encumbered as of 2/22/25: $0

H254504

Council District:

D

Location:

Forest Hill

Project Schedule/Status: FY 25: Design FY 26: Right-of-Way/Utility Relocations FY 27: Construction

Expended/Enc.

Budget

PROJECT DESCRIPTION: The purpose of this project is to improve the traffic capacity and safety at the Grafton Shop Road at MD 23 Intersection. The Maryland State Highway Administration is adminstering the project with Harford County contributing 10% of the project cost.

This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.

EXPENDITURE SCHEDULE

Cost Element

Prior

FY 2026 Approp Total

FY 2027 FY 2028 FY 2029 FY 2030 FY 2031

TOTAL

Engineering/Design Land Acquisition

150,000

20,000 10,000 20,000

170,000 10,000

170,000 10,000 370,000

Construction

20,000 350,000

Inspection Fees

0 0

0 0

Equipment/Furnishing

Total Cost:

150,000

50,000

200,000 350,000

0

0

0

0

550,000

FUNDING SCHEDULE

R7000 Future Bonds R7100 Prior Bonds

50,000

50,000 350,000

400,000 150,000

150,000

150,000

0 0

0 0

Total Cost:

150,000

50,000

200,000 350,000

0

0

0

0

550,000

ESTIMATED OPERATING BUDGET IMPACT: Estimated Debt Service

FY 2026

FY 2027 FY 2028 FY 2029 FY 2030 FY 2031

TOTAL 30,135

5,740

5,453

5,166

4,879

4,592

4,305

309