FY 26 Proposed Capital Budget Book

Water & Sewer Laboratory Improvements

WATER Project Number: Council District:

Expended/Encumbered $0

New

F

Location:

Abingdon

Project Schedule/Status: FY24 - Design (LC-MS/MS Lab) FY25 - Construction (LC-MS/MS Lab) FY26 - Design FY26 - Construction

Expended/Enc.

Budget

PROJECT DESCRIPTION: This project provides funds for the study, design and construction of laboratory improvements for the Division of Water & Sewer. The improvements will enable the use of advancing test methods and equipment and the configuration of lab facilities in order to produce high quality drinking water, treat wastewater for environmental re-use, and comply with evolving regulations. Project work includes: improvements for an on-site LC-MS/MS analysis capability and the relocation of the microbiology lab, both to the Abingdon WTP location. Future project work includes: evaluation & design of further laboratory consolidation and re-configuration.

EXPENDITURE SCHEDULE

FY 2027 FY 2028 FY 2029 FY 2030 FY 2031

TOTAL

Cost Element

Prior

FY 2026 Approp Total

Engineering/Design Land Acquisition

250,000

250,000

250,000

0

0

Construction

0 2,000,000 2,000,000

4,000,000

Inspection Fees

0 0

0 0

Equipment/Furnishing

Total Cost:

0 250,000

250,000 2,000,000 2,000,000

0

0

0

4,250,000

FUNDING SCHEDULE

250,000

250,000

250,000

R8750 Paygo R7000 Future Bonds

0 2,000,000 2,000,000

4,000,000

0 0

0 0

Total Cost:

0 250,000

250,000 2,000,000 2,000,000

0

0

0

4,250,000

ESTIMATED OPERATING BUDGET IMPACT:

FY 2026

FY 2027

FY 2028

FY 2029

FY 2030

FY 2031

TOTAL

357