FY 26 Proposed Capital Budget Book
Water Zone Improvements
WATER Project Number: Council District:
Expended/Encumbered as of 2/4/25: $1,054,462
W146660 Multiple
Location:
Various
Project Schedule/Status: This is an ongoing project to maintain the condition of critical water infrastructure. FY25 - Laurel Valley Vault design FY25 - Tollgate Road Parallel Water Main design FY26 - Laurel Valley Vault construction FY26 - Tollgate Road Parallel Water Main construction
Expended/Enc.
Budget
PROJECT DESCRIPTION: This project allows for the evaluation, modeling, design, comprehensive study, construction, and/or installation of water mains, controls, safety improvements, backflow preventers, meter, and equipment as needed within the four separate zones of Harford County's water service area. This project allows for water piping loops and/or upsizing of pipes within the system, and improvements to the water booster stations that benefit an individual zone or entire service area. Project work includes: Laurel Valley vault relocation; Route 40 Pressure reducing valve(PRV) replacement; Conowingo Road loop (complete); Aumar Village loop; update water model and Comprehensive System Study; Tollgate Road Parallel Water Main.
EXPENDITURE SCHEDULE
FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
TOTAL
Cost Element
Prior
FY 2026 Approp Total
Engineering/Design Land Acquisition
390,000
390,000 400,000
50,000
50,000
50,000
50,000 990,000
0
0
0
Construction
1,230,000 3,073,783 4,303,783
4,303,783
Inspection Fees
0 0
0 0
0 0
Equipment/Furnishing
Total Cost:
1,620,000 3,073,783 4,693,783 400,000
50,000
50,000
50,000
50,000 5,293,783
FUNDING SCHEDULE R8750 Paygo R8757 W&S Restricted Paygo
1,620,000
1,620,000 400,000
50,000
50,000
50,000
50,000 2,220,000
3,073,783 3,073,783
3,073,783
0 0
0 0
Total Cost:
1,620,000 3,073,783 4,693,783 400,000
50,000
50,000
50,000
50,000 5,293,783
ESTIMATED OPERATING BUDGET IMPACT:
FY 2026
FY 2027
FY 2028
FY 2029
FY 2030
FY 2031
TOTAL
359