FY 26 Proposed Capital Budget Book
Perryman GAC Plant Improvements
WATER Project Number: Council District:
Expended/Encumbered as of 2/4/25: $90,034
W186046
F
Location:
Perryman
Project Schedule/Status: Ongoing, awaiting APG funding and execution for flow metering. FY26 - Flow meter and control valve
Expended/Enc.
Budget
PROJECT DESCRIPTION: This project allows for the study, design and installation of improvements at the Perryman Water Treatment plant. The existing system consists of eleven 20,000 pound carbon filters. There are 6 to 8 valves on each individual filter. The system components are between 20 and 25 years old and many of the valves are deteriorating due to age. This project will replace the valves and install a flow metering system on each filter to allow optimum control and utilization of the carbon in the treatment system (complete). The project includes installation of a new flow meter and system control valve.
EXPENDITURE SCHEDULE
FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
TOTAL
Cost Element
Prior
FY 2026 Approp Total
Engineering/Design Land Acquisition
0 0
0 0
Construction
500,000
500,000
500,000
Inspection Fees
0 0
0 0
Equipment/Furnishing
Total Cost:
500,000
0
500,000
0
0
0
0
0
500,000
FUNDING SCHEDULE
500,000
500,000
500,000
R8750 Paygo
0 0 0 0
0 0 0 0
Total Cost:
500,000
0
500,000
0
0
0
0
0
500,000
ESTIMATED OPERATING BUDGET IMPACT:
FY 2026
FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
TOTAL
367