FY 26 Proposed Capital Budget Book

Water Tank Design and Construction

WATER Project Number: Council District:

Expended/Encumbered as of 2/4/25: $179,011

W196152 Multiple

Location:

Various

Project Schedule/Status: This project is water modeling dependent

Expended/Enc.

Budget

This project is to be closed.

PROJECT DESCRIPTION: This project provides for the study, master plan modeling, land acquisition, design, and construction of a new water storage tank in Zone 1 (Trimble Road), or other locations as identified to meet Adequate Public Facility (APF) requirements for potential development. This project is to be closed and remaining balance to go to W146660, Water Zone Improvements).

EXPENDITURE SCHEDULE

FY 2027 FY 2028 FY 2029 FY 2030 FY 2031

TOTAL

Cost Element

Prior

FY 2026 Approp Total

Engineering/Design Land Acquisition

300,000

300,000

300,000

0 0 0 0

0 0 0 0

Construction

Inspection Fees

Equipment/Furnishing

Total Cost:

300,000

0

300,000

0

0

0

0

0

300,000

FUNDING SCHEDULE

300,000

300,000

300,000

R8750 Paygo

0 0 0 0

0 0 0 0

Total Cost:

300,000

0

300,000

0

0

0

0

0

300,000

ESTIMATED OPERATING BUDGET IMPACT:

FY 2026

FY 2027 FY 2028 FY 2029 FY 2030 FY 2031

TOTAL

370

Made with FlippingBook flipbook maker