FY 26 Proposed Capital Budget Book
Bush Creek Pumping Station
SEWER Project Number: Council District:
Expended/Encumbered as of 2/4/25: $27,838,623
S086692
A
Location:
Abingdon
Project Schedule/Status: FY24 - Complete pump replacement design FY26 - Pump replacement construction
Expended/Enc.
Budget
PROJECT DESCRIPTION: This project is needed to bring the existing Bush Creek Pump Station up to a safe pumping capacity of 28 mgd and also to replace the 1968 force main under the Bush River. This project is required in order to safely deliver the current and projected wastewater flow to the Bynum Run drainage area. In addition, this project must construct part of the Sod Run Interceptor II and new gravity main through River Colony in Perryman. Project work includes the replacement and piping upgrade of 4 350-horsepower pumps, required to extend the useful life of the station, and allow simultaneous use of both receiving force mains for service resilience.
EXPENDITURE SCHEDULE
FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
TOTAL
Cost Element
Prior
FY 2026 Approp Total
Engineering/Design Land Acquisition
1,983,283
1,983,283
1,983,283
0
0
Construction
36,416,717 2,000,000 38,416,717
38,416,717 1,000,000
Inspection Fees
1,000,000
1,000,000
Equipment/Furnishing
0
0
Total Cost:
39,400,000 2,000,000 41,400,000
0
0
0
0
0 41,400,000
FUNDING SCHEDULE R8750 Paygo R7100 Prior Bonds R8757 W&S Restricted Paygo
1,900,000 37,500,000
1,900,000 37,500,000 2,000,000
1,900,000 37,500,000 2,000,000
2,000,000
0
0
Total Cost:
39,400,000 2,000,000 41,400,000
0
0
0
0
0 41,400,000
ESTIMATED OPERATING BUDGET IMPACT: Estimated Debt Service
FY 2026
FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
TOTAL
5,650,313
1,076,250 1,022,438 968,625 914,813 861,000 807,188
375