FY 26 Proposed Capital Budget Book
Pumping Station Improvements
SEWER Project Number: Council District:
Expended/Encumbered as of 2/4/25: $914,345
S186112 Multiple Various
Location:
Project Schedule/Status: FY24 - James Run discharge design FY25 - Winters Run PS upgrade design FY26 - Winters Run PS upgrade construction
Expended/Enc.
Budget
FY25 - Bill Bass PS upgrade design FY28 - Bill Bass PS construction
PROJECT DESCRIPTION: This project shall allow for the study, design and construction of improvements to pumping stations in the County service area that are reaching their design life and require improvements beyond what is typical maintenance of minor replacement of parts. The improvements would include but not be limited to pump replacement, motor replacement, motor control upgrades to meet new electrical code requirements, odor control, screening and access improvements for safety concerns. This project includes PS facility improvements like painting, roofing, siding and interiors.
Project work includes: James Run PS force main discharge manhole upgrade; odor control upgrades; influent screening upgrades; VFD, and controls upgrade at Bill Bass PS and Winters Run PS.
EXPENDITURE SCHEDULE
Cost Element
Prior
FY 2026 Approp Total
FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
TOTAL
Engineering/Design Land Acquisition
1,215,738 500,000 1,715,738 300,000
200,000
200,000
2,415,738
0
0
Construction
350,000 2,900,000 3,250,000
5,000,000
500,000
8,750,000
Inspection Fees
250,000
250,000
300,000
550,000
Equipment/Furnishing
0 0 1,565,738 3,650,000 5,215,738 300,000 5,300,000 200,000 500,000 200,000 11,715,738
Total Cost:
FUNDING SCHEDULE
R8750 Paygo R6999 Other
1,351,000 3,650,000 5,001,000 300,000 5,300,000 200,000 500,000 200,000 11,501,000 214,738 214,738 214,738 0 0 0 0 1,565,738 3,650,000 5,215,738 300,000 5,300,000 200,000 500,000 200,000 11,715,738
Total Cost:
ESTIMATED OPERATING BUDGET IMPACT:
FY 2026
FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
TOTAL