FY 26 Proposed Capital Budget Book

Sod Run WWTP Ultraviolet Disinfection Project

SEWER Project Number: Council District:

Expended/Encumbered as of 2/4/25: $4,554,819

S186113 Multiple Various

Location:

Project Schedule/Status: FY24 - Complete Design FY25 - Construction

Expended/Enc.

Budget

PROJECT DESCRIPTION: This project is the design and construction of the Sod Run WWTP Ultraviolet Disinfection System. This project will replace the existing chlorine and sulfur dioxide disinfection systems with an ultraviolet light (UV) system. This project will improve the safety of the County's employees and the surrounding area by eliminating the handling of 1 ton chlorine and sulfur dioxide cylinder at the Sod Run WWTP. It will be both a safety improvement as well as a cost effective change in how disinfection is performed on the wastewater discharged to the Bush River.

The current project includes improvements to the disinfection system. The future use of UV disinfection is being reevaluated in light of possible alternatives.

EXPENDITURE SCHEDULE

FY 2027 FY 2028 FY 2029 FY 2030 FY 2031

TOTAL

Cost Element

Prior

FY 2026 Approp Total

Engineering/Design Land Acquisition

200,000

200,000

200,000

0

0

Construction

8,500,000

8,500,000

8,500,000

Inspection Fees

350,000 350,000

700,000

700,000

Equipment/Furnishing

0

0

Total Cost:

9,050,000 350,000 9,400,000

0

0

0

0

0

9,400,000

FUNDING SCHEDULE

200,000 350,000

550,000

550,000

R8750 Paygo R7100 Prior Bonds R7000 Future Bonds

8,850,000

8,850,000

8,850,000

0 0 0

0 0 0

Total Cost:

9,050,000 350,000 9,400,000

0

0

0

0

0

9,400,000

ESTIMATED OPERATING BUDGET IMPACT:

FY 2026 253,995

FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 241,295 228,596 215,896 203,196 190,496

TOTAL

1,333,474