FY 26 Proposed Capital Budget Book

Bill Bass PS FM Replacement

SEWER Project Number: Council District:

Expended/Encumbered as of 2/4/25: $415,216

S136730

A

Location:

Edgewood

Project Schedule/Status: Project in design phase - 65% complete. Finalizing easement with BGE Constellation. Waiting on modeling confirmation prior to construction.

Expended/Enc.

Budget

PROJECT DESCRIPTION: This project will allow for the funding of design and construction of a new replacement force main (installed in 1969) to the Bill Bass Pump Station. By adding a larger force main, the pump station's capacity can be increased from 15.4 MGD to over 18 MGD. During the design, the existing force main (FM) will be looked at to consider a rehabilitation of the existing line in case of an emergency. The existing FM is 10,500 of 24 inch main of which 3,800 LF is a river crossing.

EXPENDITURE SCHEDULE

FY 2027 FY 2028 FY 2029 FY 2030 FY 2031

TOTAL

Cost Element

Prior

FY 2026 Approp Total

Engineering/Design Land Acquisition

610,302 200,000

610,302 200,000

400,000

1,010,302

200,000

Construction

0 0 0

0 0 0

Inspection Fees

Equipment/Furnishing

Total Cost:

810,302

0

810,302

0

0 400,000

0

0

1,210,302

FUNDING SCHEDULE

700,020 110,282

700,020 110,282

700,020 510,282

R7100 Prior Bonds R8750 Paygo

400,000

0 0 0

0 0 0

Total Cost:

810,302

0

810,302

0

0 400,000

0

0

1,210,302

ESTIMATED OPERATING BUDGET IMPACT:

FY 2026 20,091

FY 2027 FY 2028 FY 2029 FY 2030 FY 2031

TOTAL

108,154

Estimated Debt Service

19,086

18,082

19,756

16,072

15,068

383