FY 26 Proposed Capital Budget Book

Lower Bynum Run Interceptor Phase 6&7

SEWER Project Number: Council District:

Expended/Encumbered $0

New

C

Location:

Emmorton

Project Schedule/Status: Phase 7 is complete, the design for phase 6 of the project is modeling dependent.

Expended/Enc.

Budget

PROJECT DESCRIPTION: This project will provide for the funding of design, permits and construction of a parallel to the existing Bynum Run interceptor, from Wheel Road to the Plumtree Interceptor, near MacPhail. This project consists of two phases. Phase 6 is approximately 5,200 linear feet from GIS Asset ID manhole #104091 and traverse from Wheel Road to Patterson Mill Road. Phase 7 is approximately 6,400 linear feet from GIS Asset ID manhole #104091 to manhole #104200 and runs from near Patterson Mill Road to MacPhail Road. This project is required to ensure capacity for new connections in the Development Envelope surrounding Bel Air and to help avoid sanitary sewer overflows.

EXPENDITURE SCHEDULE

FY 2027 FY 2028 FY 2029 FY 2030 FY 2031

TOTAL

Cost Element

Prior

FY 2026 Approp Total

Engineering/Design Land Acquisition

0 0 0 0 0 0

0 0

Construction

500,000 5,000,000

5,500,000

Inspection Fees

0 0

Equipment/Furnishing

Total Cost:

0

0

0 500,000 5,000,000

0

0

5,500,000

FUNDING SCHEDULE

0 0

500,000

500,000

R8750 Paygo R7000 Future Bonds

5,000,000

5,000,000

0 0 0

.

0 0

Total Cost:

0

0

0 500,000 5,000,000

0

0

5,500,000

ESTIMATED OPERATING BUDGET IMPACT:

FY 2026

FY 2027 FY 2028 FY 2029 FY 2030 FY 2031

TOTAL