FY 27 Proposed Capital Budget
Chestnut Hill Road Bridge #41
HIGHWAYS - BRIDGES Project Number:
Expended/Encumbered $0
New
Council District:
D
Location:
Forest Hill
Project Schedule/Status: FY 27/29: Design FY 30: Right-of-Way Outyear: Construction
Expended/Enc.
Budget
PROJECT DESCRIPTION: This project will replace the existing bridge on Chestnut Hill Road over Cabbage Branch. The current structure is a single lane bridge and is posted at 25,000 lbs for a single unit vehicle and 46,000 lbs for combination vehicles. The new bridge would eliminate posting and provide a new two lane bridge. The project is necessary due to the deterioration of the bridge deck and steel beams, and is eligible for Federal funding. The project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.
EXPENDITURE SCHEDULE
Cost Element
Prior
FY 2027 Approp Total
FY 2028 FY 2029 FY 2030 FY 2031
FY 2032
TOTAL
Engineering/Design Land Acquisition
450,000
450,000
450,000
900,000 50,000
0 0 0 0
50,000
Construction
0 0 0
Inspection Fees
Equipment/Furnishing
Total Cost:
0 450,000
450,000
0 450,000
50,000
0
0
950,000
FUNDING SCHEDULE
R3140 Federal TAP R7000 Future Bonds
360,000 90,000
360,000 90,000
360,000 90,000
720,000 230,000
50,000
Total Cost:
0 450,000
450,000
0 450,000
50,000
0
0
950,000
FY 2027
FY 2028 FY 2029 FY 2030 FY 2031
FY 2032
TOTAL
ESTIMATED OPERATING BUDGET IMPACT:
275