FY 27 Proposed Capital Budget
Madonna Road Bridge #113
HIGHWAYS - BRIDGES Project Number:
Expended/Encumbered as of 2/3/26: $351,239
H214505
Council District:
D
Location:
Madonna
Project Schedule/Status: FY 21-27: Design FY 28/29: Right of Way/ Permits/ Utility FY 31/32: Construction
Expended/Enc.
Budget
PROJECT DESCRIPTION: This project is to replace the entire bridge that carries Madonna Road over Deer Creek. The beams, deck, and abutments are deteriorated and need to be replaced. This project is eligible for Federal funding. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.
EXPENDITURE SCHEDULE
Cost Element
Prior
FY 2027 Approp Total
FY 2028 FY 2029 FY 2030 FY 2031
FY 2032
TOTAL
Engineering/Design Land Acquisition
650,000 300,000
950,000 70,000
950,000 70,000
50,000
20,000
Construction
0 0 0
1,250,000 1,250,000 2,500,000
Inspection Fees
75,000
75,000 150,000
Equipment/Furnishing
0
Total Cost:
700,000 320,000
1,020,000
0
0
0 1,325,000 1,325,000 3,670,000
FUNDING SCHEDULE
R3140 Federal TAP R7100 Prior Bonds R7000 Future Bonds
520,000 240,000
760,000 180,000 80,000
1,060,000 1,060,000 2,880,000
180,000
180,000
80,000
265,000
265,000 610,000
Total Cost:
700,000 320,000
1,020,000
0
0
0 1,325,000 1,325,000 3,670,000
FY 2027
FY 2028 FY 2029 FY 2030 FY 2031
FY 2032
TOTAL 31,563
Estimated Debt Service ESTIMATED OPERATING BUDGET IMPACT:
6,012
5,711
5,411
5,110
4,810
4,509