FY 27 Proposed Capital Budget

Joppa Farm Road

HIGHWAYS - ROADS Project Number:

Expended/Encumbered as of 2/3/26: $199,914

H254505

Council District:

A

Location:

Joppatowne

Project Schedule/Status: FY 27: Construction - Phase 1 FY 28: Design FY 29: Right-of-Way FY 30/FY 31/Outyears: Construction

Expended/Enc.

Budget

PROJECT DESCRIPTION: A preliminary engineering study is to be performed on Joppa Farm Road between US 40 and Barksdale Road to determine possible improvements to improve road safety, reduce future road maintenance and improve walking and cycling options. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation to serve existing and future populations.

EXPENDITURE SCHEDULE

Cost Element

Prior

FY 2027 Approp Total

FY 2028 FY 2029 FY 2030 FY 2031 FY 2032

TOTAL

Engineering/Design Land Acquisition

500,000

500,000 500,000

1,000,000

0

50,000

50,000

Construction

500,000

500,000

1,000,000 1,000,000

2,500,000

Inspection Fees

0 0

0 0

Equipment/Furnishing

Total Cost:

500,000 500,000 1,000,000 500,000

50,000 1,000,000 1,000,000

0

3,550,000

FUNDING SCHEDULE

R7000 Future Bonds R7100 Prior Bonds

500,000

500,000 500,000

50,000 1,000,000 1,000,000

3,050,000

500,000

500,000

500,000

0 0

0 0

Total Cost:

500,000 500,000 1,000,000 500,000

50,000 1,000,000 1,000,000

0

3,550,000

ESTIMATED OPERATING BUDGET IMPACT:

FY 2027 16,700

FY 2028 FY 2029 FY 2030 FY 2031 FY 2032

TOTAL 87,675

Estimated Debt Service

15,865

15,030

14,195

13,360

12,525