FY 27 Proposed Capital Budget
Stormdrain Rehabilitation
HIGHWAYS - ROADS Project Number:
Expended/Encumbered as of 2/3/26: $2,778,913
H064513 Multiple Various
Council District:
Location:
Project Schedule/Status: Various projects are continuously being designed and constructed under this account.
Expended/Enc.
Budget
PROJECT DESCRIPTION: Funds are to be used for replacement/rehabilitation/repair of existing stormdrain systems throughout the County. Additional funds are to be used for an inspection of the stormdrains. Due to the cost associated with inspecting all of the stormdrains in the County, the stormdrains most susceptible to deterioration will be inspected in the first phase of this analysis (i.e. corrugated metal pipes, greater than 48" in diameter and with a continuous base flow of water).
This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.
EXPENDITURE SCHEDULE
Cost Element
Prior
FY 2027 Approp Total
FY 2028 FY 2029 FY 2030 FY 2031 FY 2032
TOTAL
Engineering/Design Land Acquisition
365,000
15,000
380,000
15,000
15,000
15,000
15,000
15,000
455,000
0
0
Construction
2,676,231 310,000 2,986,231 310,000 310,000 310,000 310,000 310,000
4,536,231
Inspection Fees
250,000
25,000
275,000
25,000
25,000
25,000
25,000
25,000
400,000
Equipment/Furnishing
0
0
Total Cost:
3,291,231 350,000 3,641,231 350,000 350,000 350,000 350,000 350,000
5,391,231
FUNDING SCHEDULE
R8750 Paygo R7100 Prior Bonds
2,741,231 350,000 3,091,231 350,000 350,000 350,000 350,000 350,000
4,841,231
550,000
550,000
550,000
0 0 0
0 0 0
Total Cost:
3,291,231 350,000 3,641,231 350,000 350,000 350,000 350,000 350,000
5,391,231
ESTIMATED OPERATING BUDGET IMPACT: Estimated Debt Service
FY 2027 18,370
FY 2028 FY 2029 FY 2030 FY 2031 FY 2032
TOTAL 96,443
17,452
16,533
15,615
14,696
13,778
315