FY 27 Proposed Capital Budget
Abingdon WTP Switch Gear/Generator Upgrade
WATER Project Number: Council District:
Expended/Encumbered as of 2/3/26: $556,382
W205424
F
Location:
Abingdon
Project Schedule/Status: FY27 - Construction
Expended/Enc.
Budget
PROJECT DESCRIPTION: The electrical feed switch gear and main breaker system into the Abingdon Water Treatment Plant was recently evaluated and spare units are no longer available. A critical failure could put the plant operation in jeopardy. This project will design and build a new switch gear and back up generator system. The single new switch gear will integrate two separate electrical feeds and a back-up generator for redundancy of plant power sources, and resiliency during electrical interruptions. This project will also include an evaluation and upgrades of lightning protection.
EXPENDITURE SCHEDULE
FY 2028 FY 2029 FY 2030 FY 2031 FY 2032
TOTAL
Cost Element
Prior
FY 2027 Approp Total
Engineering/Design Land Acquisition
450,000
450,000
450,000
0
0
Construction
11,000,000 500,000 11,500,000
11,500,000
Inspection Fees
500,000
500,000
500,000
Equipment/Furnishing
0
0
Total Cost:
11,950,000 500,000 12,450,000
0
0
0
0
0 12,450,000
FUNDING SCHEDULE
6,150,000
6,150,000
6,150,000 6,300,000
R7100 Prior Bonds R8750 Paygo
5,800,000 500,000 6,300,000
0 0
0 0
Total Cost:
11,950,000 500,000 12,450,000
0
0
0
0
0 12,450,000
ESTIMATED OPERATING BUDGET IMPACT: Estimated Debt Service
FY 2027 205,410
FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 195,140 184,869 174,599 164,328 154,058
TOTAL
1,078,403