FY 27 Proposed Capital Budget

US 40 Water Main Replacement

WATER Project Number: Council District:

Expended/Encumbered as of 2/3/26: $0

W265401 Multiple Aberdeen

Location:

Project Schedule/Status: FY27 - Evaluate pipe condition

Expended/Enc.

Budget

PROJECT DESCRIPTION: This project will allow for the design and construction of a parallel or replacement water main along route 40 to replace the existing aged pipe.

EXPENDITURE SCHEDULE

FY 2028 FY 2029 FY 2030 FY 2031 FY 2032

TOTAL

Cost Element

Prior

FY 2027 Approp Total

Engineering/Design Land Acquisition

250,000

250,000 250,000

500,000

0 0 0 0

0 0 0 0

Construction

Inspection Fees

Equipment/Furnishing

Total Cost:

250,000

0

250,000 250,000

0

0

0

0

500,000

FUNDING SCHEDULE R8757 W&S Restricted Paygo

250,000

250,000

250,000 250,000

R8750 Paygo

0 250,000

0 0 0

0 0 0

Total Cost:

250,000

0

250,000 250,000

0

0

0

0

500,000

ESTIMATED OPERATING BUDGET IMPACT:

FY 2027

FY 2028 FY 2029 FY 2030 FY 2031 FY 2032

TOTAL

375