FY 27 Proposed Capital Budget

Replacement of Water Booster Station SCADA

WATER Project Number: Council District:

Expended/Encumbered as of 2/3/26: $3,884,188

W156492 Multiple Abingdon

Location:

Project Schedule/Status:

Expended/Enc.

Budget

PROJECT DESCRIPTION: This project will allow for a study to select the appropriate replacement system for Water Booster Station Supervisory Control and Data Acquisition (SCADA) system. The project will allow for the design and performance specifications to be developed and installed. The existing SCADA equipment is obsolete and parts are not manufactured anymore and Siemens does not support the system equipment. Project work will proceed phase-wise, based on evaluation and on-call professional advisement. It will include replacement and/or upgrade of all the distribution system's RTUs

EXPENDITURE SCHEDULE

Cost Element

Prior

FY 2027 Approp Total FY 2028 FY 2029 FY 2030 FY 2031 FY 2032

TOTAL

Engineering/Design Land Acquisition

300,000

300,000

300,000

0

0

Construction Inspection Fees

3,650,000

3,650,000

3,650,000

0 0

0 0

Equipment/Furnishing

Total Cost:

3,950,000

0 3,950,000

0

0

0

0

0 3,950,000

FUNDING SCHEDULE R7100 Prior Bonds R8750 Paygo

1,950,000 2,000,000

1,950,000 2,000,000

1,950,000 2,000,000

0 0 0

0 0 0

Total Cost:

3,950,000

0 3,950,000

0

0

0

0

0 3,950,000

FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032

TOTAL

ESTIMATED OPERATING BUDGET IMPACT: Estimated Debt Service

341,933

65,130

61,874 58,617 55,361 52,104 48,848

378