FY 27 Proposed Capital Budget
Bio Solids Facilities Enhancements
SEWER Project Number: Council District:
Expended/Encumbered as of 2/3/26: $18,436,547
S176019 Multiple Various
Location:
Project Schedule/Status: FY24 - Complete digester improvements design FY25 - Digester improvements construction FY26 - Design of screw filter press FY27 - Construction of screw filter press
Expended/Enc.
Budget
PROJECT DESCRIPTION: This project is to fund the enhancements to our bio solids treatment facilities and bio solids recycling/disposable program. Bio solids (processed residuals from the treatment of domestic wastewater) contain nutrients and other qualities that improve soils and make them highly desirable to many area farmers within Harford County and elsewhere in Maryland. However, nutrient controls being imposed by the State Department of Agriculture and MDE to help protect the Chesapeake Bay are dramatically affecting the ability to recycle these materials. Reduced application rates and time of year restrictions have created a significant impact to our program. A study done in 2013 recommended advances to our solids treatment train, enhanced drying, dewatering, storage, beneficial utilization and optimization of biogas, and beneficial reuse of the dried bio solids. Project includes improvements to the digester system for bio solids optimization.
Specific project work includes: improvements to the digester system; improvements to dewatering; improvements to thickening; upgrade to biosolids drying. Future work includes installation of a second screw filter press to provide redundancy.
EXPENDITURE SCHEDULE
Cost Element
Prior
FY 2027 Approp Total
FY 2028 FY 2029 FY 2030 FY 2031 FY 2032
TOTAL
Engineering/Design Land Acquisition
1,650,000 350,000
2,000,000
2,000,000
0
0
Construction
17,600,000 4,000,000 21,600,000 3,500,000
25,100,000
Inspection Fees
550,000
550,000 200,000
750,000
Equipment/Furnishing
0
0
Total Cost:
19,800,000 4,350,000 24,150,000 3,700,000
0
0
0
0 27,850,000
FUNDING SCHEDULE
500,000 4,350,000
4,850,000 3,700,000
8,550,000 19,300,000
R8750 Paygo R7100 Prior Bonds
19,300,000
19,300,000
0 0 0
0 0 0
Total Cost:
19,800,000 4,350,000 24,150,000 3,700,000
0
0
0
0 27,850,000
ESTIMATED OPERATING BUDGET IMPACT: Debt Service
FY 2027 644,620
FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 612,389 580,158 547,927 515,696 483,465
TOTAL
3,384,255