FY 27 Proposed Capital Budget
Renewal and Replacement Sewer Infrastructure
SEWER Project Number: Council District:
Expended/Encumbered as of 2/3/26: $3,845,801
S126726 Multiple Various
Location:
Project Schedule/Status: FY27 Sewer and manhole rehabilitation
Expended/Enc.
Budget
PROJECT DESCRIPTION: This project will provide funding for modeling, design and construction to refurbish or replace major sewer mains, manholes, vaults, pumping stations, and apparatus that have reached or are nearing the end of their useful life. This project also funds emergency projects for sewer system upgrades from breaks or failures. Project work includes: clean and line McPhail road discharge manholes and pipe; Harford Square sewer extension and pump station abandonment; aerial pipeline coatings (Bynum interceptor); Bel Forest Cleanout replacement/lining; Temple Hills exposed sewer; sewer model calibration.
EXPENDITURE SCHEDULE
FY 2028 FY 2029 FY 2030 FY 2031 FY 2032
TOTAL
Cost Element
Prior
FY 2027 Approp Total
Engineering/Design Land Acquisition
600,000 100,000
700,000
50,000
750,000
0
0
Construction
5,550,000 1,000,000 6,550,000 2,000,000 800,000 800,000 800,000 800,000 11,750,000
Inspection Fees
0 200,000
200,000
Equipment/Furnishing
0 0 6,150,000 1,100,000 7,250,000 2,250,000 800,000 800,000 800,000 800,000 12,700,000
Total Cost:
FUNDING SCHEDULE
2,650,000 1,100,000 3,750,000 2,250,000 800,000 800,000 800,000 800,000
9,200,000
R7100 Prior Bonds R8750 Paygo R7000 Future Bonds
0
0
3,500,000
3,500,000
3,500,000
0 0
0
0 6,150,000 1,100,000 7,250,000 2,250,000 800,000 800,000 800,000 800,000 12,700,000
Total Cost:
ESTIMATED OPERATING BUDGET IMPACT: Estimated Debt Service
FY 2027 116,900
FY 2028 FY 2029 FY 2030 FY 2031 FY 2032
TOTAL
613,725
111,055 105,210
99,365
93,520
87,675