FY 27 Proposed Capital Budget

HCSO Northern Precinct Camera Project

PUBLIC SAFETY Project Number: Council District:

Expended/Encumbered $0

NEW

D

Location:

3726 Norrisville Road

Project Schedule/Status:

Commencement after receipt of funding.

Expended/Enc.

Budget

PROJECT DESCRIPTION: The Northern Precinct is a 24 hour per day, 365 days per year autonomous public safety building located in Jarrettsville. The access control system, server, and security camera system is a critical operational safety system that has been identified to have reached its end of life and can no longer be updated or supported. This project would replace the current system with approximately thirty security cameras, one primary security access server, and four remote touchscreen servers. It requires 10 intercom boxes, 17 access control keypads , and the labor to install the hardware and wiring. The new system would allow for the required level of security and provide for the same equipment that has recently replaced outdated systems in several other Sheriff's Office and County buildings.

EXPENDITURE SCHEDULE

Cost Element

Prior

FY 2027 Approp Total

FY 2028 FY 2029 FY 2030 FY 2031 FY 2032

TOTAL

Engineering/Design Land Acquisition

0 0 0 0

0 0 0 0

Construction

Inspection Fees

Equipment/Furnishing

400,000

400,000 400,000

400,000 400,000

Total Cost:

0 400,000

0

0

0

0

0

FUNDING SCHEDULE

R8750 Paygo

400,000

400,000

400,000

0 0 0 0

0 0 0 0

Total Cost:

0 400,000

400,000

0

0

0

0

0

400,000

Maintenance ESTIMATED OPERATING BUDGET IMPACT:

FY 2027

FY 2028 FY 2029 FY 2030 FY 2031 FY 2032

TOTAL 24,000

0

0

6,000

6,000

6,000

6,000

98