FY 27 Proposed Operating Budget
Bureau of Engineering
2%
Water Engineering Sewer Engineering
1,346,197 1,192,522 2,538,719
W&S Administration 5,998,470 4%
Bureau of Engineering 2,538,719 2%
Water Production 16,004,964 12%
W&S Maintenance 12,387,579 9%
Wastewater Processing 24,002,738 18%
Depreciation 15,100,000 11%
Other 58,389,530 43%
106
Made with FlippingBook Digital Proposal Maker