SCADA Information Management Systems
WATER Project Number: Council District:
Operating Budget Impact
W196144 Multiple
Revenues:
Location:
Various
Expenditures: Cost Savings: None:
Est. Debt Service:
$52,500 (annual)
X
Expended/Encumbered as of 1/9/23: $246,967
Project Schedule/Status: 2022-2024: evaluate existing systems and develop design for solutions; installation and integration of new data management system; programming and reports development.
PROJECT DESCRIPTION: This project is for the study, design, and installation of an information management system that will safely collect, store, archive, retrieve and create reports for all the data generated by the Water and Sewer Division. The Division currently has five separate SCADA systems at each facility. There is no uniformity or central database for the retrieval of information or report. generation. Upgrades to each SCADA system will be undertaken followed by the installation of a common data management library. The five SCADA systems are the Sod Run WWTP, Joppatowne WWTP, Abingdon WTP, Water Booster Station, and the Wastewater Pumping Station.
EXPENDITURE SCHEDULE
Cost Element
Prior
FY 2024 Approp Total
FY 2025 FY F026 FY 2027 FY 2028 FY 2029
TOTAL
Engineering/Design Land Acquisition
750,000
750,000
750,000
0 0 0
0 0 0
Construction
Inspection Fees
Equipment/Furnishing
1,750,000 2,500,000 4,250,000 1,000,000 2,500,000 2,500,000 5,000,000 1,000,000
5,250,000 6,000,000
Total Cost:
0
0
0
0
FUNDING SCHEDULE
R8750 Paygo R7000 Future Bonds
2,500,000
2,500,000 1,000,000
3,500,000 2,500,000
2,500,000 2,500,000
0 0 0
0 0 0
Total Cost:
2,500,000 2,500,000 5,000,000 1,000,000
0
0
0
0
6,000,000
385