FY 25 Harford County Approved Capital Budget

Glenville Road Bridge #30

HIGHWAYS - BRIDGES Project Number:

Operating Budget Impact

H164501 Multiple

Council District:

Revenues:

Location:

Churchville

Expenditures: Cost Savings: None:

Est. Debt Service:

$5,040

(annual)

X

Expended/Encumbered as of 2/22/24: $350,126

Project Schedule/Status: FY 22-23: Design and right of way FY 27: Utility relocation and construction

PROJECT DESCRIPTION: This project is to replace the bridge that carries Glenville Road over Mill Brook. The existing bridge is a single lane, steel beam, concrete deck structure. The existing concrete deck, exterior beams, and wingwalls are severely deteriorated and there is evidence of scour under the western abutment. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.

EXPENDITURE SCHEDULE

Cost Element

Prior

FY 2025 Approp Total

FY 2026 FY 2027 FY 2028 FY 2029 FY 2030

TOTAL

Engineering/Design Land Acquisition

810,000 400,000 1,210,000

1,210,000

50,000

50,000

50,000

Construction

0 0 0

1,850,000

1,850,000

Inspection Fees

150,000

150,000

Equipment/Furnishing

0

Total Cost:

860,000 400,000 1,260,000

0 2,000,000

0

0

0

3,260,000

FUNDING SCHEDULE

R8750 Paygo R3140 Federal TAP R7000 Future Bonds R7100 Prior Bonds

150,000

150,000 900,000 80,000 130,000

150,000

580,000 320,000

1,600,000

2,500,000

80,000

400,000

480,000 130,000

130,000

0

0

Total Cost:

860,000 400,000 1,260,000

0 2,000,000

0

0

0

3,260,000