FY 25 Harford County Approved Capital Budget
Perryman GAC Plant Improvements
WATER Project Number: Council District:
Operating Budget Impact Revenues:
W186046
F
Location:
Perryman
Expenditures: Cost Savings:
Est. Debt Service:
$0
(annual)
None: X
Expended/Encumbered as of 2/22/24: $90,034
Project Schedule/Status: Ongoing, awaiting APG funding and execution for flow metering FY24 - Design carbon storage FY25 - Construct carbon storage
PROJECT DESCRIPTION: This project allows for the study, design and installation of improvements at the Perryman Water Treatment plant. The existing system consists of eleven 20,000 pound carbon filters. There are 6 to 8 valves on each individual filter. The system components are between 20 and 25 years old and many of the valves are deteriorating due to age. This project will replace the valves and install a flow metering system on each filter to allow optimum control and utilization of the carbon in the treatment system. A carbon storage facility is also planned under this project.
EXPENDITURE SCHEDULE
Cost Element
Prior
FY 2025 Approp Total
FY 2026 FY 2027 FY 2028 FY 2029 FY 2030
TOTAL
Engineering/Design Land Acquisition
0 0
0 0
Construction
250,000 250,000
500,000
500,000
Inspection Fees
0 0
0 0
Equipment/Furnishing
Total Cost:
250,000 250,000
500,000
0
0
0
0
0
500,000
FUNDING SCHEDULE
250,000 250,000
500,000
500,000
R8750 Paygo
R8751 Prior Paygo
0 0 0 0
0 0 0 0
Total Cost:
250,000 250,000
500,000
0
0
0
0
0
500,000