FY 25 Harford County Approved Capital Budget

Water Zone Improvements

WATER Project Number: Council District:

Operating Budget Impact Revenues:

W146660 Multiple

Location:

Various

Expenditures: Cost Savings:

Est. Debt Service:

$0

(annual)

None: X

Expended/Encumbered as of 2/22/24: $409,645

Project Schedule/Status: This is an ongoing project to maintain the condition

of critical water infrastructure. FY25 - Laurel Valley Vault Design FY25 - Laurel Valley Vault Construction

PROJECT DESCRIPTION: This project allows for the evaluation, modeling, design, comprehensive study, construction, and/or installation of water mains, controls, safety improvements, backflow preventers, meter, and equipment as needed within the four separate zones of Harford County's water service area. This project allows for water piping loops and/or upsizing of pipes within the system, and improvements to the water booster stations that benefit an individual zone or entire service area. Project work includes: Laurel Valley vault relocation; Route 40 Pressure reducing valve(PRV) replacement; Conowingo Road loop; Aumar Village loop; update water model and Comprehensive System Study.

EXPENDITURE SCHEDULE

Cost Element

Prior

FY 2025 Approp Total

FY 2026 FY 2027 FY 2028 FY 2029 FY 2030

TOTAL

Engineering/Design Land Acquisition

300,000

90,000

390,000

50,000 400,000

50,000

50,000

50,000

990,000

0

0

Construction

930,000 300,000 1,230,000 300,000

1,530,000

Inspection Fees

0 0

0 0

Equipment/Furnishing

Total Cost:

1,230,000 390,000 1,620,000 350,000 400,000

50,000

50,000

50,000

2,520,000

FUNDING SCHEDULE

1,230,000 390,000 1,620,000 350,000 400,000

50,000

50,000

50,000

2,520,000

R8750 Paygo

R7000 Future Bonds

0 0 0 0

0 0 0 0

Total Cost:

1,230,000 390,000 1,620,000 350,000 400,000

50,000

50,000

50,000

2,520,000