Stafford Road Bridge #24

HIGHWAYS - BRIDGES Project Number:

Operating Budget Impact

H154502

Council District:

D

Revenues:

Location:

Darlington

Expenditures: Cost Savings: None:

Est. Debt Service:

$20,875 (annual)

X

Expended/Encumbered as of 2/9/22: $459,307

Project Schedule/Status: Design is 95% complete and construction is planned for FY 23. Steel prices have doubled and concrete costs have risen 10%, and this is a steel beam bridge. The FY 23 funding request is due to the rise in supply costs.

PROJECT DESCRIPTION: This bridge carries Stafford Road over Deer Creek. The bridge, built in 1950, shows numerous deficiencies and areas of deterioration. The purpose of this project is to rehabilitate the bridge to extend its useful life for another 40 years. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.

EXPENDITURE SCHEDULE

Approp Total

Cost Element

Prior

FY 2023

FY 2024 FY 2025 FY 2026 FY 2027 FY 2028

TOTAL

Engineering/Design Land Acquisition

405,000

405,000

405,000

0

0

Construction

2,900,000 350,000 3,250,000

3,250,000

Inspection Fees

100,000

100,000

100,000

Equipment/Furnishing

0

0

Total Cost:

3,405,000 350,000 3,755,000

0

0

0

0

0

3,755,000

FUNDING SCHEDULE

R8750 Paygo R3140 Federal TAP R7100 Prior Bonds R7000 Future Bonds

40,000

40,000

40,000

2,600,000 280,000 2,880,000

2,880,000

765,000

765,000 70,000

765,000 70,000

70,000

0

0

Total Cost:

3,405,000 350,000 3,755,000

0

0

0

0

0

3,755,000