FY 23 APPROVED CAPITAL BUDGET
Bynum Ridge Replacement Sewer
SEWER Project Number: Council District:
Operating Budget Impact
S156010
D
Revenues:
Location:
Rock Spring
Expenditures: Cost Savings: None:
Est. Debt Service:
$0
(annual)
X
Expended/Encumbered as of 2/9/22: $639,972
Project Schedule/Status: Right of Way and design is underway; project is developer dependent.
PROJECT DESCRIPTION: This project is located in the Bynum Ridge subdivision adjacent to Bowles Terrace and consists of two phases. This project will cover the County's 60% reimbursement portion of Phase 1 and 100% surcharge portion for Phase II for replacement of the existing line. The cost of the project for increase in capacity is the Developer's responsibility and is in accordance with the Rules and Regulations. Phase 1 consists of approximately 835' of 15 inch sewer which replaces the 12 inch sewer between lots 16 to 20 and 28 to 33, built under contract 6010. Phase 2 consists of approximately 795' of 15 inch sewer which replaces the 12 inch sewer between lots 13 to 16 and 20 to 27, built under contract 6010.
EXPENDITURE SCHEDULE
Approp Total
Cost Element
Prior
FY 2023
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028
TOTAL
Engineering/Design Land Acquisition
40,000
40,000
40,000
0
0
Construction
760,000
760,000
760,000
Inspection Fees
0 0
0 0
Equipment/Furnishing
Total Cost:
800,000
0
800,000
0
0
0
0
0
800,000
FUNDING SCHEDULE
R8750 Paygo
800,000
800,000
800,000
0 0 0 0
0 0 0 0
Total Cost:
800,000
0
800,000
0
0
0
0
0
800,000