FY 24 APPROVED CAPITAL BUDGET BOOK
Deep Run Road Bridge #152
HIGHWAYS - BRIDGES Project Number:
Operating Budget Impact
H214503
Council District:
D
Revenues:
Location:
Whiteford
Expenditures: Cost Savings: None:
Est. Debt Service:
$7,350
(annual)
X
Expended/Encumbered as of 1/9/23: $277,821
Project Schedule/Status: FY 22-23: Right of way and permits FY 24: Construction Design is 75% complete
PROJECT DESCRIPTION: This project is to replace the bridge that carries Deep Run Road over Deep Run. The existing bridge has a deteriorated deck and superstructure. Plans are currently in place for a complete reconstruction of the bridge and abutments. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.
$775,000 reallocated from Norrisville Highways Facility Capital project.
EXPENDITURE SCHEDULE
Cost Element
Prior
FY 2024 Approp Total
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
TOTAL
Engineering/Design Land Acquisition
280,000 30,000
280,000 30,000 740,000 75,000
280,000 30,000 740,000 75,000
Construction
40,000 700,000
Inspection Fees
75,000
Equipment/Furnishing
0
0
Total Cost:
350,000 775,000 1,125,000
0
0
0
0
0
1,125,000
FUNDING SCHEDULE
R7100 Prior Bonds R7000 Future Bonds
350,000
350,000 775,000
350,000 775,000
775,000
0 0 0
0 0 0
Total Cost:
350,000 775,000 1,125,000
0
0
0
0
0
1,125,000