FY 24 APPROVED CAPITAL BUDGET BOOK

Johnson Mill Road Bridge #45

HIGHWAYS - BRIDGES Project Number:

Operating Budget Impact

H174502

Council District:

D

Revenues:

Location:

Hickory

Expenditures: Cost Savings: None:

Est. Debt Service:

$32,550 (annual)

X

Expended/Encumbered as of 1/9/23: $232,941

Project Schedule/Status: FY18/19: Design FY 20: Right-of-Way FY 21/24: Construction

Design Complete

PROJECT DESCRIPTION: This project is to replace the Johnson Mill Road Bridge #45 over Stout Bottle Branch. This is a single lane structure with average daily traffic volumes of approximately 500 vehicles. The bridge railing is substandard and a part of the northwest wingwall is failing. The concrete deck and exterior beams are deteriorating resulting in a posting of 10 tons. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.

EXPENDITURE SCHEDULE

Cost Element

Prior

FY 2024 Approp Total

FY 2025 FY 2026 FY 2027 FY 2028 FY 2029

TOTAL

Engineering/Design Land Acquisition

250,000 25,000

250,000 25,000

250,000 25,000

Construction

1,075,000 100,000 1,175,000

1,175,000

Inspection Fees

100,000

100,000

100,000

Equipment/Furnishing

0

0

Total Cost:

1,450,000 100,000 1,550,000

0

0

0

0

0

1,550,000

FUNDING SCHEDULE

R7100 Prior Bonds R7000 Future Bonds

1,450,000

1,450,000

1,450,000

100,000

100,000

100,000

0 0 0

0 0 0

Total Cost:

1,450,000 100,000 1,550,000

0

0

0

0

0

1,550,000