FY 26 Harford County Proposed Capital Budget Book
Madonna Road Bridge #113
HIGHWAYS - BRIDGES Project Number:
Expended/Encumbered as of 2/4/25: $359,886
H214505
Council District:
D
Location:
Madonna
Project Schedule/Status: FY 21-26: Design FY 26/27: Right of Way/ Permits/ Utility FY 30: Construction
Expended/Enc.
Budget
PROJECT DESCRIPTION: This project is to replace the entire bridge that carries Madonna Road over Deer Creek. The beams, deck, and abutments are deteriorated and need to be replaced. This project is eligible for Federal funding. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.
EXPENDITURE SCHEDULE
Cost Element
Prior
FY 2026 Approp Total
FY 2027 FY 2028 FY 2029 FY 2030
FY 2031
TOTAL
Engineering/Design Land Acquisition
550,000 100,000
650,000 50,000
650,000 50,000
50,000
Construction
0 0 0
2,500,000
2,500,000
Inspection Fees
150,000
150,000
Equipment/Furnishing
0
Total Cost:
600,000 100,000
700,000
0
0
0 2,650,000
0 3,350,000
FUNDING SCHEDULE
R3140 Federal TAP R7100 Prior Bonds R7000 Future Bonds
440,000 160,000
80,000
520,000 160,000 20,000
2,120,000
2,640,000
160,000 550,000
20,000
530,000
Total Cost:
600,000 100,000
700,000
0
0
0 2,650,000
0 3,350,000
FY 2026
FY 2027 FY 2028 FY 2029 FY 2030
FY 2031
TOTAL 27,122
Estimated Debt Service ESTIMATED OPERATING BUDGET IMPACT:
5,166
4,908
4,649
4,391
4,133
3,875