FY 26 Harford County Proposed Capital Budget Book

Old Pylesville Road Bridge #138

HIGHWAYS - BRIDGES Project Number:

Expended/Encumbered $0

New

Council District:

D

Location:

Pylesville

Project Schedule/Status: FY 26: Design FY 28: Right of Way/ Permits/ Utility FY 29: Construction

Expended/Enc.

Budget

PROJECT DESCRIPTION: This project will replace the existing bridge on Old Pylesville Road over Jacks Hole stream. The current structure is a poor rated structure with both the deck and supestructure in poor condition. Replacement of the bridge will remove a poor rated bridge from the County inventory.

EXPENDITURE SCHEDULE

Cost Element

Prior

FY 2026 Approp Total

FY 2027 FY 2028 FY 2029 FY 2030

FY 2031

TOTAL

Engineering/Design Land Acquisition

400,000

400,000

400,000 25,000 850,000 85,000

0 0 0 0

25,000

Construction

850,000 85,000

Inspection Fees

Equipment/Furnishing

0

Total Cost:

0 400,000

400,000

0

25,000 935,000

0

0 1,360,000

FUNDING SCHEDULE

R7000 Future Bonds

400,000

400,000

0

25,000 935,000

0

0 1,360,000

Total Cost:

0 400,000

400,000

0

25,000 935,000

0

0 1,360,000

Estimated Debt Service ESTIMATED OPERATING BUDGET IMPACT:

FY 2026 11,480

FY 2027 FY 2028 FY 2029 FY 2030

FY 2031

TOTAL 60,270

10,906

10,332

9,758

9,184

8,610

282