Intersection Improvements

HIGHWAYS - ROADS Project Number:

Expended/Encumbered as of 2/4/25: $3,755,760

H054507 Multiple Various

Council District:

Location:

Project Schedule/Status: FY 25: Bel Air S. Parkway and Tollgate Roundabout Construction FY 25: Abingdon Rd & Peverly Run Rd Roundabout Design FY 26: Abingdon Rd & Peverly Run Rd Roundabout Construction

Expended/Enc.

Budget

PROJECT DESCRIPTION: The purpose of this project is to improve the traffic capacity and safety at selected intersections throughout the County. Reduced levels of service on most roads is a direct result of limited capacity at the intersections. Therefore, widening or redesign of the intersection under the project can result in increased capacity and safety with decreased delay. Additionally, intersections with reduced sight distance may be corrected under this project.

This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.

EXPENDITURE SCHEDULE

Cost Element

Prior

FY 2026 Approp Total

FY 2027 FY 2028

FY 2029

FY 2030 FY 2031

TOTAL

Engineering/Design Land Acquisition

417,500 420,000

837,500 115,000

20,000

20,000

20,000

20,000

20,000

937,500 115,000

115,000

Construction

4,906,728 350,000 5,256,728 350,000 350,000

350,000 350,000 350,000

7,006,728

Inspection Fees

427,500

30,000

457,500

30,000

30,000

30,000

30,000

30,000

607,500

Equipment/Furnishing

0

0

Total Cost:

5,866,728 800,000 6,666,728 400,000 400,000

400,000 400,000 400,000

8,666,728

FUNDING SCHEDULE

R8750 Paygo R6330 Developer R7100 Prior Bonds R7000 Future Bonds R3199 Federal Other

3,181,728

3,181,728

3,181,728

250,000

250,000

250,000

2,435,000

2,435,000

2,435,000 2,400,000

400,000 400,000

400,000 400,000 400,000

400,000 400,000 400,000

400,000

400,000

Total Cost:

5,866,728 800,000 6,666,728 400,000 400,000

400,000 400,000 400,000

8,666,728

ESTIMATED OPERATING BUDGET IMPACT: Debt Service

FY 2026 81,365

FY 2027 FY 2028

FY 2029 69,160

FY 2030 FY 2031

TOTAL

427,164

77,296

73,228

65,092

61,023

311