FY 27 Proposed Capital Budget
Rush Road Bridge #97
HIGHWAYS - BRIDGES Project Number:
Expended/Encumbered as of 2/3/26: $368,511
H244502
Council District:
D
Location:
Jarrettsville
Project Schedule/Status: FY 26/27: Right of way/ Utility/ Permits FY 27: Construction
Expended/Enc.
Budget
PROJECT DESCRIPTION: This project will replace the existing bridge on Rush Road over Kellogg Branch. The current structure is a single lane bridge and is posted at 24,000 lbs for single unit vehicles and 43,000 lbs for combination vehicles. The new bridge would eliminate posting and provide a two lane bridge. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.
EXPENDITURE SCHEDULE
Cost Element
Prior
FY 2027 Approp Total
FY 2028 FY 2029 FY 2030 FY 2031
FY 2032
TOTAL
Engineering/Design Land Acquisition
400,000 25,000
400,000 25,000 975,000 100,000
400,000 25,000 975,000 100,000
Construction
75,000 900,000
Inspection Fees
100,000
Equipment/Furnishing
0
0
Total Cost:
500,000 1,000,000 1,500,000
0
0
0
0
0 1,500,000
FUNDING SCHEDULE
R7100 Prior Bonds R7000 Future Bonds
500,000
500,000
500,000
1,000,000 1,000,000
1,000,000 0 0 0
Total Cost:
500,000 1,000,000 1,500,000
0
0
0
0
0 1,500,000
Estimated Debt Service ESTIMATED OPERATING BUDGET IMPACT:
FY 2027 50,100
FY 2028 FY 2029 FY 2030 FY 2031
FY 2032 37,575
TOTAL
263,025
47,595
45,090
42,585
40,080
282