FY 27 Proposed Capital Budget
Cullum Road Bridge #12
HIGHWAYS - BRIDGES Project Number:
Expended/Encumbered as of 2/3/26: $0
H264501
Council District:
F
Location:
Belcamp
Project Schedule/Status: FY 26-28: Design FY 29: Right of Way FY 32: Construction
Expended/Enc.
Budget
PROJECT DESCRIPTION: This project will be for the rehabilitation of the Cullum Road Bridge #112 over tributary to James Run. The project is to replace the bridge superstructure which currently consists of bituminous concrete filled corrugated metal deck supported with steel beams. The project is necessary due to the deterioration of the bridge deck and steel beams, and is eligible for Federal funding. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.
EXPENDITURE SCHEDULE
Cost Element
Prior
FY 2027 Approp Total
FY 2028 FY 2029 FY 2030 FY 2031
FY 2032
TOTAL
Engineering/Design Land Acquisition
450,000
450,000 450,000
900,000 25,000
0 0 0 0
25,000
Construction
1,850,000 1,850,000 150,000 150,000
Inspection Fees
Equipment/Furnishing
0
Total Cost:
450,000
0
450,000 450,000
25,000
0
0 2,000,000 2,925,000
FUNDING SCHEDULE R3140 Federal TAP R8770 Reappropriated R7100 Prior Bonds
360,000
360,000 360,000
1,600,000 2,320,000
0
0
90,000
90,000
90,000
R7000 Future Bonds
0
90,000
25,000
400,000 515,000
Total Cost:
450,000
0
450,000 450,000
25,000
0
0 2,000,000 2,925,000
FY 2027
FY 2028 FY 2029 FY 2030 FY 2031
FY 2032
TOTAL 15,782
Estimated Debt Service ESTIMATED OPERATING BUDGET IMPACT:
3,006
2,856
2,705
2,555
2,405
2,255
291
Made with FlippingBook Ebook Creator